Chairwoman of the Public Works, Capital Projects and Transportation Committee, Laura Petit, and Deputy Chair Dean J. Fabiano offer the following:
WHEREAS, this resolution has been submitted at the request of the County Executive on behalf of the Department of Public Works; and
WHEREAS, the Hall of Records is a records storage facility and vault located at 300 Foxhall Avenue in Kingston, which has been occupied by the Ulster County government since 1997; and
WHEREAS it has been determined that the Hall of Records roof is approximately 22,550 square feet and in need of rehabilitation work; and
WHEREAS this restoration project intends to use contract labor to renovate the roof by removing existing loose aggregate from the existing roof; repair any noted deficiencies; re‐flash entire perimeter, curbs, penthouse walls, penetrations, soils sacks with new flashing membrane; upgrade and remediate all internal drain(s) flashing membrane and sump areas. Then apply a restorative waterproofing top‐pour over embedded aggregate with new pea‐gravel into newly applied layer of waterproofing over entire roof mat; and
WHEREAS, pursuant to Resolution No. 416 of 2019, the Department of Public Works requested that the Department of the Environment complete a study to determine the feasibility of installing a solar photovoltaic (PV) system on the roof of the building; and
WHEREAS, the Solar Feasibility Study determined that a rooftop solar PV system is economically and structurally feasible at the Hall of Records; and
WHEREAS, the Hall of Records is served by a single electricity meter and a rooftop solar array would produce approximately 56% of the building’s average electricity needs each year; and
WHEREAS, design of the roof restoration project recommends cool roof technology during renovation, a technology designed to reflect more sunlight and absorb less heat than a standard roof and yield significant energy savings through a reduction in cooling load inside the building; and
WHEREAS, Additionally, by decreasing roof temperature, a cool roof design may extend roof service life; and
WHEREAS, the project expenditures in the amount of $560,600.00 for the Roof Replacement Program, were approved in the 2022 – 2027 Capital Program; and
WHEREAS, the Commissioner of Public Works requests that Capital Project No. 639 be established and funded in the amount of $560,600.00; now, therefore be it
RESOLVED, that Capital Project No. 639 for the Hall of Records Roof Restoration Project be established as follows:
CREATE AMOUNT
Capital Project No. 639 Hall of Records Roof $560,600.00
and, be it further
RESOLVED, that the 2022 Ulster County Capital Fund budget is hereby amended as follows:
INCREASE AMOUNT
HH.1997.0639-2300.2550 Construction $560,600.00
(App. #)
HH.1997. 0639-3500.5710 Serial Bonds $560,600.00
(Rev. #),
and move its adoption.
ADOPTED BY THE FOLLOWING VOTE:
AYES: NOES:
Passed Committee: Public Works, Capital Projects and Transportation on _______________.
Passed Committee: Ways and Means on _______________.
FINANCIAL IMPACT:
$560,600.00 – COUNTY CAPITAL FUND APPROPRIATIONS
$560,600.00 – COUNTY REVENUE – SERIAL BONDS
***A BOND RESOLUTION WILL BE REQUIRED***
Current Text: PDF
Updated: August 2, 2022
Votes on this Resolution
yes no abstained no voteVote to Adopt Resolution No. 383
Committee Vote to Adopt Resolution No. 383
Committee Vote to Adopt Resolution No. 383
...